Last week,we put windows and doors on position temporarily,then, we fixed soffit.
Put windows and doors on position temporarily with small pieces of block(3mm to 8mm).Measure window frame or door frame from inside,beyond lintel stud or sill 10mm,then nail them temporarily.For big door,we put steel and plastic mat on the sill before we fix it.
Fix soffit under soffit frame, nail one side on the nogs,other side is in fascia or fly rafter,connect them with jointer.
we also fixed cavity batten on the wall frame horizontally,under soffit directly,1 nail/300 mm.
Friday, November 26, 2010
Thursday, November 18, 2010
Building wrap
We have done some work last week.
1.Wrap building paper around the building,from top plate/nog to boundary joist,leave doors and windows off,make sure that the wrap is both straight and tight;
2.Fix blue ribbon 3 lines around the building,hold building paper firm,prevent building paper ratten;
3.Fix plastic corner at windows and doors,for bottom sill;
4.Put aulband(sealant tape) on the 4 corners of windows and doors,top corners run 200mm both directions,bottom sill has a full length aluband and also run 200mm up both sides.Make sure push aluband tight on the corners;
5.Fix vermin strip on the boundary joist;
6.Vertical fixing cavity battens at the edge of windows and doors,also at 4 corners.
1.Wrap building paper around the building,from top plate/nog to boundary joist,leave doors and windows off,make sure that the wrap is both straight and tight;
2.Fix blue ribbon 3 lines around the building,hold building paper firm,prevent building paper ratten;
3.Fix plastic corner at windows and doors,for bottom sill;
4.Put aulband(sealant tape) on the 4 corners of windows and doors,top corners run 200mm both directions,bottom sill has a full length aluband and also run 200mm up both sides.Make sure push aluband tight on the corners;
5.Fix vermin strip on the boundary joist;
6.Vertical fixing cavity battens at the edge of windows and doors,also at 4 corners.
Monday, November 15, 2010
Final work of truss and wall
We did some final work of trusses and wall framing.
1.Nail ceiling batten to bottom chord;
2.Nail metal angle brace with 3 nails on the edge stud,2 nails on the middle stud;
3.Nail stud,bottom plate and joist with straps;
4.Fix jack stud,lintel/jack stud,top plate with gang nail or straps;
5.Fix external corners,2 nails / 600 mm;
6.Finish ceiling opening(trim out).
1.Nail ceiling batten to bottom chord;
2.Nail metal angle brace with 3 nails on the edge stud,2 nails on the middle stud;
3.Nail stud,bottom plate and joist with straps;
4.Fix jack stud,lintel/jack stud,top plate with gang nail or straps;
5.Fix external corners,2 nails / 600 mm;
6.Finish ceiling opening(trim out).
Sunday, November 14, 2010
truss
We were continue doing roof work last week.
We have done:
1.Nail rafters on double top plates with Z nails;
2.Nail purlins on rafters with Z nails;
3.Fix dragon ties at ceiling corner and fix brace at the center of roof.
4.Fix nogs on lower rafter for soffit;
5.Fix a diagonal outrigger on a roof corner,fix fly rafter on the outrigger and purlin;
6.Put jack stud between top plate and lintel, then connect jack stud and lintel with strips bracing;
7.Connect studs and top plates with U nails at inside.
8.Nail ceiling batten under truss;
We nearly have finished roof work,have little to do next week.
We have done:
1.Nail rafters on double top plates with Z nails;
2.Nail purlins on rafters with Z nails;
3.Fix dragon ties at ceiling corner and fix brace at the center of roof.
4.Fix nogs on lower rafter for soffit;
5.Fix a diagonal outrigger on a roof corner,fix fly rafter on the outrigger and purlin;
6.Put jack stud between top plate and lintel, then connect jack stud and lintel with strips bracing;
7.Connect studs and top plates with U nails at inside.
8.Nail ceiling batten under truss;
We nearly have finished roof work,have little to do next week.
Thursday, November 4, 2010
place trusses
We began to set up trusses two weeks ago,I'll write how to do it in sequence.
Steps to set up trusses:
1.Erecting scaffolding;
2.Trusses are delivered to site,hang them on top plate in correct order,bracing them on the floor temporarily;
3.Reading the plan of setting up trusses;
4.Marking trusses space;
5.Position gable end truss.Mark centre of building width, also mark centre of bottom cord. These two marks will align the truss to the centre position.Temporary brace and plumb both gable trusses
6.String a line between the two apexes,one is the front,another is the second truss from back;
7.Position intermediate ( common ) trusses.Position each truss according to the markings along the top plates,align the apex of each truss with the string line ( gable-gable );
8. Nail ceiling runner at the centre along these trusses and fix brace on both gable trusses.
9.Fix purlins on the trusses.150mm from the apex to the lower side,spacing is 600 mm and 500 mm.The lowest is flush with the edge of rafter;
10.Fix outriggers to gable trusses and fix fly rafters to outriggers;
11.Fix strap bracing at front area and back area;
We haven't finished it yet,we'll continue do it next week.
Steps to set up trusses:
1.Erecting scaffolding;
2.Trusses are delivered to site,hang them on top plate in correct order,bracing them on the floor temporarily;
3.Reading the plan of setting up trusses;
4.Marking trusses space;
5.Position gable end truss.Mark centre of building width, also mark centre of bottom cord. These two marks will align the truss to the centre position.Temporary brace and plumb both gable trusses
6.String a line between the two apexes,one is the front,another is the second truss from back;
7.Position intermediate ( common ) trusses.Position each truss according to the markings along the top plates,align the apex of each truss with the string line ( gable-gable );
8. Nail ceiling runner at the centre along these trusses and fix brace on both gable trusses.
9.Fix purlins on the trusses.150mm from the apex to the lower side,spacing is 600 mm and 500 mm.The lowest is flush with the edge of rafter;
10.Fix outriggers to gable trusses and fix fly rafters to outriggers;
11.Fix strap bracing at front area and back area;
We haven't finished it yet,we'll continue do it next week.
Sunday, October 31, 2010
Scaffolding and trusses
Last two weeks,we have tacked double top plate on the top plate and put ceiling batten on.
First,we tacked double top plate on external wall framing,2 nails / 400 mm,then we put one edge of ceiling batten in the double top plate,another edge of ceiling batten is on internal wall framing from building's back to the front,the ceiling batten's space is 330 mm. we also put double top plate(short)on internal wall between ceiling batten.
we spent a lot of time on erecting scaffolding last week.I think it's worth.Spending more time,means making it stable and safety for us in the future.We have known Right angle coupling,swiveling coupling,jointer etc scaffolding connector and learned how to erect scaffolding,how to make it firm.
we began to tack trusses last week,about this section,I'll write next week.
First,we tacked double top plate on external wall framing,2 nails / 400 mm,then we put one edge of ceiling batten in the double top plate,another edge of ceiling batten is on internal wall framing from building's back to the front,the ceiling batten's space is 330 mm. we also put double top plate(short)on internal wall between ceiling batten.
we spent a lot of time on erecting scaffolding last week.I think it's worth.Spending more time,means making it stable and safety for us in the future.We have known Right angle coupling,swiveling coupling,jointer etc scaffolding connector and learned how to erect scaffolding,how to make it firm.
we began to tack trusses last week,about this section,I'll write next week.
Sunday, October 17, 2010
Wall framing
We had had two weeks break.We have been continue erecting wall framing and we have finished it this week end.I try to write the process down.
Steps of erecting wall framing:
1.Pre nail frames are delivered on site;
2.Read the plan of frame's position;
3.Establish building line ;
4.Start with back walls;
5.connecting next wall;Generally from corner;
6.2 nails/600mm;Nail plate with galvanize nail;Flush on outside;Fix bottom temporary;Interior frames temporary connected;Leave bathroom walls free frame connection;Put temporary braces on frames(square building);Put temporary braces on floor(enforce frames);
7.Looking for connecting frame,work to the front;
8.Straightening frames; Level corners at stud's both side,top and bottom plate have to touch;
9.String line on top and bottom plate,checking with 3 blocks(exactly the same thickness);
10.Fix frame permanent except bathroom wall.
Steps of erecting wall framing:
1.Pre nail frames are delivered on site;
2.Read the plan of frame's position;
3.Establish building line ;
4.Start with back walls;
5.connecting next wall;Generally from corner;
6.2 nails/600mm;Nail plate with galvanize nail;Flush on outside;Fix bottom temporary;Interior frames temporary connected;Leave bathroom walls free frame connection;Put temporary braces on frames(square building);Put temporary braces on floor(enforce frames);
7.Looking for connecting frame,work to the front;
8.Straightening frames; Level corners at stud's both side,top and bottom plate have to touch;
9.String line on top and bottom plate,checking with 3 blocks(exactly the same thickness);
10.Fix frame permanent except bathroom wall.
Sunday, September 19, 2010
Sub-floor
I have finished my assessment this weekend.
We lay-outed foil insulation and sheets last week.I have written how to do them in assessment.I am tired and don't want to do it again.
We will erect framing next week,I am looking forward to it.
We lay-outed foil insulation and sheets last week.I have written how to do them in assessment.I am tired and don't want to do it again.
We will erect framing next week,I am looking forward to it.
Subscribe to: