We did some final work of trusses and wall framing.
1.Nail ceiling batten to bottom chord;
2.Nail metal angle brace with 3 nails on the edge stud,2 nails on the middle stud;
3.Nail stud,bottom plate and joist with straps;
4.Fix jack stud,lintel/jack stud,top plate with gang nail or straps;
5.Fix external corners,2 nails / 600 mm;
6.Finish ceiling opening(trim out).
No comments:
Post a Comment