We were continue doing roof work last week.
We have done:
1.Nail rafters on double top plates with Z nails;
2.Nail purlins on rafters with Z nails;
3.Fix dragon ties at ceiling corner and fix brace at the center of roof.
4.Fix nogs on lower rafter for soffit;
5.Fix a diagonal outrigger on a roof corner,fix fly rafter on the outrigger and purlin;
6.Put jack stud between top plate and lintel, then connect jack stud and lintel with strips bracing;
7.Connect studs and top plates with U nails at inside.
8.Nail ceiling batten under truss;
We nearly have finished roof work,have little to do next week.
No comments:
Post a Comment