Sunday, July 24, 2011

Soffit and weatherboard

soffit
1.fix soffit on soffit frame,on side in fascia, another on soffit pattern;
2.PVC jointer;

weatherboard
1.cavity batten on studs,spacing no more than 600 mm,1nail/300mm;
2.cavity trim on bottom or above head flashing,fix flashing on corners;
3.measure the height of wall to be covered;
4.mark the level position with storey rod;
5.fix from bottom,50 mm lapped;
6.fix one by one from bottom to top;
7.notched for head flashing;
8.coat for cut edge,jointer and soaker for normal joint or exterior corner joint;
9.nail weatherboard with nail set, drill first at edges ,then nail them.

No comments:

Post a Comment