Saturday, May 7, 2011

1,3 hatfield and 5,7hatfield drive albany

Address:1,3,5,7 hatfield drive albany
Start: 29 April 2011
Basic information:.Concrete slab foundation had been done.4 sections belong to 1 owner,we are building all of them.they have the similar structure:2 titles in 1 section.One is 5 bedrooms and 2 garages,other is 2 bedrooms and 1 garage.Both are 2 levels,total 340 square meters in one section.
What I have done
Erecting first floor framing,adjusting wall and fixing bottom plate to concrete slab;
Fixing second floor joist on double top plate;
Laying sheet on the joists;
Erecting second floor framing,adjusting wall.
I spent a lot of time to write my assessment,so i don't have time to record working exactly.The first floor frames of 1,3 hatfield have been sent on site.It will start to erect next week.

1 comment:

  1. Nice one Leon! As a progression you can use photos of your work and add simple discussion to support it. I am glad you have found some work experience, hopefully it leads to an apprenticeship.

    Cheers, Muks

    ReplyDelete